
Flexible High Power Charging Station
DEUTZ PowerTree
The PowerTree by DEUTZ is the first plug and play flexible fast-charging station. It is a mobile and robust system for recharging machinery quickly and safely.

FAST CHARGING, ROBUST CONSTRUCTION, MOBILE USE
The PowerTree delivers a charging capacity of up to 150 kilowatts with CCS2-DC fast charging. With a possible output voltage of more than 800 volts, the construction machinery can be recharged in just 20 minutes.
The mobile fast-charging system is housed in a robust 10-foot container. This makes it easy to transport the system to wherever the machines are being used. And thanks to the power bank function, no grid connection is required.
Your major benefits of the DEUTZ PowerTree

High end industry components

Plug & play fast charging at construction site

Easy installation and commissioning

Zero emission certified

High flexibility through mobile use

100% fast charging without grid connection

Peak shaving

SET-UP, PLUG-IN, CHARGE
- Transport to your work location
- Set up and if needed connect to grid
- PowerTree provides high power charging
- Charge whenever and wherever you want
KEY FACTS AT A GLANCE
TECHNICAL DATA | Version 1.5 - 126 kWh |
---|---|
Battery type | Li-Ion (NMC) |
Nominal Voltage | 352 V |
Installed nominal capacity | 126 kWh |
DC Discharge power | 150 kW @ 800 V, 75 kW @ 400 V |
AC Discharge current (PowerTree output) | 32 A @ 400 V + 16 A @ 230 V |
AC Charge current (PowerTree input) | 63 A @ 400 V - (Limitable software wise: 32 / 16 / 6 A) |
Cooling | Cooling for components is equipped |
Operating temperature | -30°C …+50°C |
Fire detection system | Equipped |
IP protective class | (>IP64) IP65 |
Lifetime (Full equivalent cycles during lifetime) | 10 years (~2500) |
Interfaces | CEE (AC charging & discharging), CCS2 (DC high power charging) |
Dimensions (L x W x H) | 3.000 x 2.500 x 2.600 mm |
Weight | < 5.000 kg |

DIGITAL SERVICES
Manage your PowerTree effortlessly: Our digital services provide an excellent overview of your PowerTrees. You can manage charging processes, authorizations, and sites.
Features
- Fleet management
- Charge management
- Remote servicing of charging stations
- Site control
- DEUTZ RFID card
- Display of charging processes
- Billing management
- Mobile app
- Web app
- Cloud-based
PODCAST INSIGHT
Electrified construction sites with the PowerTree
"Construction sites & excavators soon to be electric?" - Our experts Thomas Adermann and Christian Pelger tackled this question in the Charged Podcast and take us on a fascinating journey to the construction site of the future. The focus is on the key challenges of converting to an emission-free construction site:
- How do we deal with the limited battery life of power-intensive machines?
- How can construction site operators minimize longer delays in work due to charging times?
- What options are there to enable fast charging on construction sites if there is no charging infrastructure?
As solutions: Our all-electric drive system and our PowerTree! You can find all the information in the video.

Find your suitable solution as well as all technical information
With the DEUTZ engine finder you can easily filter from all our engine variants by application, power, emission or series and get a suitable engine selection.
Find your product
